← Back to Projects
Bridge Nanjing, Jiangsu Province, China

Nanjing Yangtze River Cable-Stayed Bridge

Ultra-high performance concrete deck panels and precast diaphragms engineered for exceptional durability in chloride-rich marine exposure zones. Fiber-reinforced UHPC achieved 150 MPa characteristic compressive strength with self-compacting rheology for complex formwork geometries.

Compressive Strength

150 MPa

Category

Bridge

Location

Nanjing, Jiangsu Province, China

Project Overview

This landmark infrastructure project leveraged UHPC for critical structural elements where conventional HPC could not meet the combined demands of flexural capacity, crack-width control, and 120-year design life under aggressive environmental loading.

Technical Highlights

  • Mix Design: Low water-binder ratio (W/B ≈ 0.18) with optimized silica fume and steel fiber dosage
  • Durability: Chloride diffusion coefficient reduced by 85% vs. C50/60 reference concrete
  • Production: Fully automated batching with real-time rheology monitoring via ICAR rheometer

Performance Metrics

ParameterValue
Compressive Strength (28d)150 MPa
Flexural Strength18 MPa
Elastic Modulus48 GPa
Shrinkage (90d)< 300 μɛ

Interested in a similar UHPC application? We support formulation R&D, production guidance, and OEM sourcing across China.

Get in Touch